No.Project NameDescription
 Impact Fee Update (not shown on map)This is a future project.
 Line 23 Miscellaneous Water Line Rehabilitation (not shown on map)This is a future project.
 Line 28- Miscellaneous Water Line Rehabilitation (not shown on map)This is a future project.
 Miscellaneous Water Replacement (not shown on map)This is a future project.
 Telemetric Water Meter Annual MaintenanceThis is a future project.
26Booth Calloway 2 MG Ground Storage TankThis is a future project
27Bursey 2 MG Elevated Storage TankThis is a future project.
28College Hills 5 MG General Storage TankThis is a future project.
29Johnson Booster Pump Station ExpansionThis is a future project.
30Line 1-24" WL along Mid-Cities BlvdThis is a future project.
31Line 10-Add 5 MG GST at Watauga PSThis is a future project.
32Line 11-8" WL from Davis BlvdThis is a future project.
33Line 12-8" WL from existing 24"WL in Hightower DrThis is a future project.
34Line 13-Install 3 pressure reducing stations; Hwy 377This is a future project.
35Line 14- Offsite water supply improvementsThis is a future project.
36Line 15- 16" WL along N. Tarrant ParkwayThis is a future project.
37Line 16- 16" WL along Smithfield RdThis is a future project.
38Line 17- 16" WL Hightower south along Meadow RdThis is a future project.
39Line 18- 12" WL along Eagle Crest DrThis is a future project.
40Line 19- 16" WL existing 16" WL along Janetta DrThis is a future project.
41Line 2- 30" WL along Mid-Cities BlvdThis is a future project.
42Line 20- 12" WL from Corona DrThis is a future project.
43Line 21- 12" WL along Glenview DrThis is a future project.
44Line 22- Expand pumping capacity at Watauga PSThis is a future project.
45Line 24- 16" WL from Davis BlvdThis is a future project.
46Line 25- Replace existing 8" WL along Boulevard 26This is a future project.
47Line 26- Replace 12" along Precinct Line RoadThis is a future project.
48Line 27- New 12"WL from Precinct Line RdThis is a future project.
49Line 8- 12" WL across Loop 820This is a future project.
50Line 9- 12" WL south from Janetta Dr along Holiday LnThis is a future project.
51Shady Grove 2 MG Elevated Storage TankThis is a future project.